The Motown Museum is being rebuilt around itself. A multi-phase, $75 million expansion is growing the campus on West Grand Boulevard to roughly 50,000 square feet, wrapping new buildings around the little house where Berry Gordy started a record company in 1959. There will be a recording studio, a performance theater, and a cafe named for the woman who cooked for Motown. Here is what is coming and where it stands.
The Expansion at a Glance
| Cost | $75 million, donor-driven, multi-phase |
| Size | Campus grows to about 50,000 square feet |
| The heart | Hitsville NEXT, in three historic Motown-era homes on West Grand Blvd. |
| Inside | Interactive exhibits, recording studio, theater, expanded retail, cafe |
| Timing | Phased, with reporting pointing to 2026 and a full reopening described as 2027 |
| Where | Built around the original Hitsville U.S.A. house |
Miss Lillie Gets a Cafe
Start with the smallest detail, because it tells you what this project is trying to be. The cafe is called Miss Lillie’s Motown Cafe, named for Lillie Hart, the Gordy family caretaker who became the company’s in-house cook.
She was not a producer or a session player. She fed people. In a building where teenagers were turning into legends on 12-hour days, someone made sure they ate, and Motown remembered her name. A $75 million museum could have sold that space to a sponsor. It gave it to the cook.
What Actually Gets Built
The museum lists what the finished campus will hold: dynamic interactive exhibits, a professional recording studio, an expanded retail experience, a state-of-the-art performance theater, and a casual cafe serving light food and drinks. Reporting has identified the theater as sponsored by Ford Motor Company.
The design point is that none of it replaces anything. The new construction is built around the current museum space and the Hitsville U.S.A. house itself, so the room where the hits were cut stays exactly where it is, now surrounded.
Hitsville NEXT Is the Part People Miss
The centerpiece is not an exhibit. Hitsville NEXT is a creative hub for entrepreneurship and education headquartered in three historic Motown-era homes on West Grand Boulevard, built to run community-focused programs in a modern facility.
In other words, the museum is not only preserving what happened on this block. It is trying to make the block produce again, which is a considerably harder thing to attempt than a gift shop.
What Berry Gordy Says
Gordy, who founded Motown Records and is now 96, framed the project around the people rather than the building. “It brings me real joy, and I am proud and humbled to know, that the inclusive legacy of Motown, and the most talented people who are so near and dear to my heart, will have their stories told in this new Museum,” he said.
When It Opens
Here is the honest part. Dates have moved as the phases have progressed. Coverage has pointed to a roughly 40,000-square-foot building opening as early as summer 2026, while the full grand reopening has been described as 2027. The museum’s own expansion page lays out what is coming without committing to a date.
So treat any single date carefully and check the museum’s expansion page before you plan a trip around it. In the meantime the original museum is open, and it hosts free events on the campus, including Detroit Bass Day on August 15. More in our Community coverage.
Motown Museum Expansion FAQ
How big will it be?
About 50,000 square feet across the campus, built around the Hitsville U.S.A. house.
What is inside?
Interactive exhibits, a recording studio, a performance theater, expanded retail, and a cafe.
Who is Miss Lillie?
Lillie Hart, the Gordy family caretaker who became Motown’s in-house cook. The cafe carries her name.
When does it open?
Phased. Reporting has pointed to 2026 for one building and 2027 for the full reopening.