The 25-story glass tower at 222 Third Street holds 496 apartments on the stretch of Detroit riverfront where Joe Louis Arena stood until its demolition wrapped in 2020. Detroit-based Sterling Group opened The Residences at Water Square there on February 6, 2024, and markets it as the city’s first all-glass residential high-rise. The building fronts the Detroit Riverwalk, with the water on one side and downtown on the other.
What Sterling Group built
The tower carries a mix of studios, one-bedroom units and two-bedroom penthouses, the latter set on the 25th floor. Every unit has 10-foot floor-to-ceiling windows facing the Detroit River or the skyline, according to developer materials and reporting in DBusiness. Neumann/Smith Architecture designed the building, which rose on a site the state cleared and conveyed as part of the deal that closed Joe Louis Arena.
Amenities run to an all-season pool with an outdoor sun deck, a rooftop terrace and sky lounges, a fitness center, a dog wash, indoor bike storage and valet parking. Retail space along the ground floor was still filling in at opening.
Who it is for, and at what price
The Residences at Water Square is a market-rate building. All 496 units rent at market prices with no affordable set-aside, which Sterling Group has said reflects that the tower was built with union labor and without public tax incentives, as reported by The Detroit News. Monthly rents run into the thousands, placing the building at the top of downtown Detroit’s rental market alongside a small number of other new high-rises.
The location puts residents on the Riverwalk itself, within walking distance of Huntington Place and a short drive from Comerica Park and Ford Field. The nearest Detroit People Mover stop, long called Joe Louis Arena station, was renamed Water Square station on July 23, 2025 to match the development.
The hotel rising next door
The apartment tower is one piece of a larger Sterling Group plan for the site, and it is separate from the hotel now under construction beside it. That project is a 25-story, 600-room JW Marriott, branded JW Marriott Detroit Water Square, which broke ground in April 2024. The hotel will connect to the Huntington Place convention center by skybridge, a link Sterling has said is meant to draw larger conventions downtown.
Andiamo Italian Chophouse will anchor the hotel as its signature restaurant, The Detroit News reported in October 2025. Sterling has said the hotel and restaurant are slated to open in January 2027, with the structure topping out as early as December 2025.
What is next for the site
Sterling Group acquired roughly three acres just west of the apartment tower for additional development, according to Crain’s Detroit Business, and the company has floated plans to reconfigure the People Mover station and add a pedestrian corridor through the site. Those pieces are earlier in the pipeline than the tower or the hotel. For now, the finished residential building and the rising JW Marriott are the two anchors of Water Square on Detroit’s riverfront.